Work Packages
WP1: Project management and coordination
Objective:
To ensure the efficient and timely implementation of project activities, resource allocation, and measures, to maximize project benefits
Deliverables:
D1.1 – Project Management Plan
D1.2 – Risk Management Plan
D1.3 – Data Management Plan
D1.4 – GE and RRI Policy Plan
D1.5 – Data from the LIFE KPI webtool (Ι)
D1.6 – Midterm advisory report
D1.7 – Data from the LIFE KPI webtool (ΙΙ)
D1.8 – After-life Plan
D1.9 – Final advisory report
WP2: Developing and Installing the LIFE-W2B Facility
Objective:
To design, construct, acquire, repair and upgrade existing units and install new, including all the various peripheral components (eg solar panels), of the LIFE-W2B facility in the All4Waste Technological and Innovation Park of HMU.
Deliverables:
D2.1 – Small work license
D2.2 – Existing components refurbished
D2.3 – Construction and acquisition of new components
D2.4 – The complete W2B facility delivered
D2.5 – All components operational status checked
D2.6 – Final design of the facility and the various components
WP3: Operating the LIFE-W2B Facility
Objective:
The main objective of WP3 is the operation of the LIFE-W2B facility (including biogas / syngas upgrade), under real conditions, aiming to determine the optimum operational parameters, including performance and operational costs, as well as, to identify possible shortcomings, problems, limitations and required technical additions or improvements to the original idea and set up.
Deliverables:
D3.1 – The 1st operational period
D3.2 – The optimum operational period
D3.3 – Evaluation of LIFE-W2B components / products / system
D3.4 – Operational manuals
D3.5 – Design support system
WP4: Evaluating the Real Impact of the Process
Objective:
The main objective of WP4 is the evaluation, in a clear and verifiable manner, of the real impact of the LIFE-W2B project in the sustainability of gases production process, meaning AD and GF (or PYR), through the operational upgrade provided by the SD process and the end product upgrade through the gases transformation to biomethane, the nutrients enchased biochar and the dried organic wastes’ mixtures in external AD and GF / PYR units.
Deliverables:
D4.1 – Economic evaluation
D4.2 – Environmental evaluation
D4.3 – Social impact evaluation
D4.4 – Evaluation of biomethane production sustainability
D4.5 – Benefit evaluation for climate change mitigation
D4.6 – Determining by-products real value
WP5: Sustainability, replication and exploitation of project results
Objective:
Objective: The main objective of WP5 is to secure the sustainability of this innovative and holistic waste management approach in an existing and competitive market, provide the tools for its replication either as one new and complete technology or as components in existing facilities and further enchase the exploitation of the project results including commercialization of technologies and consulting services.
Deliverables:
D5.1 – Full scale unit for the city of Heraklion
D5.2 – Full scale unit for optimum flow of waste
D5.3 – Securing operation of the pilot / demonstration unit
D5.4 – Methodology “Learn by doing” & “Replicate”
D5.5 – Let others estimate the possible benefit and applicability
D5.6 – Action “Learn by doing”
D5.7 – Action “Replicate’
D5.8 – On line design tool
D5.9 – On line CBA estimation tool
D5.10 – On line LCA estimation tool
D5.11 – Support dissemination actions
D5.12 – Replicability and tranferability actions in other EU Member States and Associated Countries
WP6: Communication and dissemination activities
Objective:
The main objective of WP6 is to design and implement a thorough, multidiscipline and with various recipients’ communication and dissemination activity, aiming in increasing the public’s awareness and understanding, promoting its replicability and transferability in other areas in EU and the globe, and informing the academic community and research organizations on the benefits of the approach.
Deliverables:
D6.1 – Website and social media accounts active
D6.2 – 10,000 Leaflets regarding or related with the project. (printed material)
D6.3 – Promotion video from the operation of the LIFE-W2B process
D6.4 – Open day Events
D6.5 – International conference proceeding.
D6.6 – Report on transferability and replicability effort – Replication Plan
D6.7 – Report on commercialisation and dissemination effort
D6.8 – Reports on legal status and barriers lifting
D6.9 – After-LIFE Conservation Plan
