Work Packages

Objective:

To ensure the efficient and timely implementation of project activities, resource allocation, and measures, to maximize project benefits

Deliverables:

D1.1 – Project Management Plan

D1.2 – Risk Management Plan

D1.3 – Data Management Plan

D1.4 – GE and RRI Policy Plan

D1.5 – Data from the LIFE KPI webtool (Ι)

D1.6 – Midterm advisory report

D1.7 – Data from the LIFE KPI webtool (ΙΙ)

D1.8 – After-life Plan

D1.9 – Final advisory report

Objective:

To design, construct, acquire, repair and upgrade existing units and install new, including all the various peripheral components (eg solar panels), of the LIFE-W2B facility in the All4Waste Technological and Innovation Park of HMU.

Deliverables:

D2.1 – Small work license

D2.2 – Existing components refurbished

D2.3 – Construction and acquisition of new components

D2.4 – The complete W2B facility delivered

D2.5 – All components operational status checked

D2.6 – Final design of the facility and the various components

Objective:

The main objective of WP3 is the operation of the LIFE-W2B facility (including biogas / syngas upgrade), under real conditions, aiming to determine the optimum operational parameters, including performance and operational costs, as well as, to identify possible shortcomings, problems, limitations and required technical additions or improvements to the original idea and set up.

Deliverables:

D3.1 – The 1st operational period

D3.2 – The optimum operational period

D3.3 – Evaluation of LIFE-W2B components / products / system

D3.4 – Operational manuals

D3.5 – Design support system

Objective:

The main objective of WP4 is the evaluation, in a clear and verifiable manner, of the real impact of the LIFE-W2B project in the sustainability of gases production process, meaning AD and GF (or PYR), through the operational upgrade provided by the SD process and the end product upgrade through the gases transformation to biomethane, the nutrients enchased biochar and the dried organic wastes’ mixtures in external AD and GF / PYR units.

Deliverables:

D4.1 – Economic evaluation

D4.2 – Environmental evaluation

D4.3 – Social impact evaluation

D4.4 – Evaluation of biomethane production sustainability

D4.5 – Benefit evaluation for climate change mitigation

D4.6 – Determining by-products real value

Objective:

Objective: The main objective of WP5 is to secure the sustainability of this innovative and holistic waste management approach in an existing and competitive market, provide the tools for its replication either as one new and complete technology or as components in existing facilities and further enchase the exploitation of the project results including commercialization of technologies and consulting services.

Deliverables:

D5.1 – Full scale unit for the city of Heraklion

D5.2 – Full scale unit for optimum flow of waste

D5.3 – Securing operation of the pilot / demonstration unit

D5.4 – Methodology “Learn by doing” & “Replicate”

D5.5 – Let others estimate the possible benefit and applicability

D5.6 – Action “Learn by doing”

D5.7 – Action “Replicate’

D5.8 – On line design tool

D5.9 – On line CBA estimation tool

D5.10 – On line LCA estimation tool

D5.11 – Support dissemination actions

D5.12 – Replicability and tranferability actions in other EU Member States and Associated Countries

Objective:

The main objective of WP6 is to design and implement a thorough, multidiscipline and with various recipients’ communication and dissemination activity, aiming in increasing the public’s awareness and understanding, promoting its replicability and transferability in other areas in EU and the globe, and informing the academic community and research organizations on the benefits of the approach.

Deliverables:

D6.1 – Website and social media accounts active

D6.2 – 10,000 Leaflets regarding or related with the project. (printed material)

D6.3 – Promotion video from the operation of the LIFE-W2B process

D6.4 – Open day Events

D6.5 – International conference proceeding.

D6.6 – Report on transferability and replicability effort – Replication Plan

D6.7 – Report on commercialisation and dissemination effort

D6.8 – Reports on legal status and barriers lifting

D6.9 – After-LIFE Conservation Plan